Popcorn Ceiling Abatement in Corridor Areas (Buildings G & H)
Project type
Asbestos Abatement
Date
August 2023
Location
1510 S. Bascom Ave, Campbell, CA 95008
Remove and dispose of asbestos ceiling texture. Totaling Approx. 2,500 SF
-
BUILDING G - At the North Side Stair Case, Upper Common Area and Lower Common Area, remove all asbestos
acoustical ceiling throughout area.
● Staircase #1 - 1 Day
● Staircase #2 - 1 Day
● Upper Common Area - 2 Days
● Lower Common Area - 2 Days
-
BUILDING H - At the North Side Stair Case, Upper Common Area, and Lower Common Area, remove all asbestos
acoustical ceiling throughout area.
● South Stair Case - 1 Day
● Upper Common Area - 2 Days
● Lower Common Area - 2 Days